Sunday, January 4, 2009

Update

Howdy folks. Hope everyone had an enjoyable, stress free and safe holiday season!

I'm still taking it easy and catching up on paperwork and some odds and ends. Things will be very slow for the next week or two while I take care of some stuff and order new sheets of steel, etc. It takes awhile to gear back up after a big push like I made before the Christmas week.

RingTools will not be ready for a little while yet. I got them last week from tumbling but they need more grinding and a retumble before I can do the final anodizing, etc. So figure two weeks for them. There is only one hole size for now and it is .838" or 21.2mm. This size will fit medium and average size fingers but probably not the giant mitts of 250 lb guys. I'll be making a second slightly larger size later on this winter. I'm not going to get into a whole bunch of sizes on these because it's a nightmare. They are what they are. The first batch is made of hefty 3/16" thick titanium stock and although I have not yet figured out the final cost I think the price will be reasonable.

Ti Rulers are also on deck with the RingTools but I still have a bunch of work to do on them. Hopefully I will get to the ti stuff later this week and get it moving along in the process again.

I will be having more lotteries in mid January. I have some more knives to finish and right after I do the prep work on the ti stuff I will get back into sheath mode.

That's about it for now. Happy Football Playoffs! ;)

0 comments:

Post a Comment